The build had ground to a halt. The guys came and went that were fixing the slab and are now no where to be seen today. They’ve certainly done half the job but missed a whole lot more – hopeless!!
I had arranged for a pre-plaster inspection from our independent building inspector but after having a look myself the house hasnt be re-wrapped, insulation has fallen out (since it went in, but has been blown out in sections by the wind as its not at lock up stage yet.
We still have dozens of outstanding issues for carpenters,plumbers, heating installers, and concreters to fix and still finding more issues because the tradies seem to be only concerned with fixing what they can see easily. No one seems to take pride in their work anymore – so dissapointing.
So, still need carpentry fixes, sarking fixes, data cabling runs with electrical cables so that needs separating, house needs to be wrapped, tons of slab repairs needed, missing insulation, windows missing, timber posts at the front of the house need to be pulled down and moved, the list goes on.
Sarking has needed to be sealed properly for weeks
Slab edge far from straight – needs jackhammering
Still havent poured the concrete to fix the corner
Gaps in the concrete slab
Jackhammered off, too much off now
Grouted up some holes, missed the one next to it
Probably needs new engineering to fix as its big