Slab issues…still

Caught up with our Site Supervisor on Friday who said that the slab is still not good enough.  The subcontractors Cornell Constructions (http://www.cornellconstructions.com.au/) have finally been given the sack.

The next delay will be Porter Davis finding someone to level out the slab once and for all.  It’s held up the build for months now.

Ticking along

Brickwork is sitting at around 90% done. The brickies have done a really nice job and have gone off to another job while engineering rework the design for the alfresco. The original solution didn’t fit in properly.  They are due back at the end of this week to finish up.

Chippies are back to pull down the timber cladding on the front of the house and re do it as there is no sarking behind the boards.  Looks good for a second time, but this time the left hand set of boards are done too.  They also have the flashing under the board done right so we can’t see the roof trusses and its watertight now – that will help 🙂

And after months of delays the concreting sub contractors have returned to fix their terrible job on the slab and have applied a self levelling screed to most of the house in order to level it out.  Each room slab level varied by over 10mm in height – worst was the rumpus room which was more than 20mm.

New items to be fixed is the laundry cabinets as the brickies decided to use it to rest their bricks on and have scratched it. Not sure why they thought that was a good idea.

Will add more pics on the weekend.  Next week we should see sanding and patching of the plasterwork and then painting should start too.

I think we are back on track

Work continues on the house, but in a good way now.  Only a couple of minor issues remain which will get resolved in due course.

The brickies have been onsite this week and are doing a great job.  Chippies also have finished putting the architraves, doors and skirting boards in.

Next up is to level the slab with a self levelling screed and get the tiles down.  Plaster work should be sanded and patched by end of next week.

Our tiles turned up too it seems – noice!

IMG_1068

 

Cabinets in

Cabinetry turned up today – really happy with the kitchen!  Wooh!  Looks awesome.

Laundry looks great too.

Ensuite cabinet.  Hard to see really…IMG_1043

As it goes on our build, the ensuite cabinet wasnt installed in the right spot.  Needs to move 120mm or so to the left – they worked of the old plans…for the 4th time <sigh>